Seismic retrofitting of this building made repair and replacement of the decorative ceiling necessary. I was involved with mold making, casting and seaming replacement parts together for the ceilings original appearance.
![thumb_subwaytermbldg_1024](http://amyhiggins.com/wp-content/uploads/2005/06/thumb_subwaytermbldg_1024-300x231.jpg)
![thumb_subway-055_1024](http://amyhiggins.com/wp-content/uploads/2005/06/thumb_Subway-055_1024-300x225.jpg)
Seismic retrofitting of this building made repair and replacement of the decorative ceiling necessary. I was involved with mold making, casting and seaming replacement parts together for the ceilings original appearance.