8, half moons in the cupola had heavy water damage and needed to be restored. I made a pounce pattern of the stenciled design to repeat over the missing areas. This project was under the direction of Spectra Company.
![](http://amyhiggins.com/wp-content/uploads/2020/09/7DCCA39B-4F76-4AED-B6A9-77086A0888CC-768x1024.jpeg)
![](http://amyhiggins.com/wp-content/uploads/2020/09/D38F0DA6-5A81-4B0B-929B-82FBBE7F6DEA-1024x768.jpeg)
![](http://amyhiggins.com/wp-content/uploads/2020/09/8A992B04-CA75-4B71-8381-9A99CDE231BD-1024x768.jpeg)
Previous Color Scheme My Color Scheme